However, in versions below 11.50.xC6, there were no physical limitations on the functions of the Workgroup Edition, and there were no restrictions on the use of licenses.
Below is a description of how you can continue to use these features when upgrading the Informix version in the above cases.
Using this feature without an IBM license agreement may cause cost problems due to breach of contract.
For reference, Growth Edition is a term that refers to the previous Workgroup Edition, and it has a different name depending on the version.
11.50.xC1 to 11.50.xC6: Workgroup Edition
11.50.xC7 to 11.50.xC9: Growth Edition
11.70: Growth Edition
12.10: Workgroup Edition
The release notes for the 11.50.xC7 version of IBM Informix provide an introduction to enabling parallel processing and fragmentation.
Enabling parallelism and fragmentation in IBM Informix Growth Edition
ImportantThese features are limited to customers who were explicitly granted the rights to use them. Customers who have Informix Dynamic Server Workgroup Edition entitlements before February 10, 2009 have been grandfathered to use these features. See the IBM Withdrawal Announcement 909-049 for specific terms and conditions: http://www-01.ibm.com/common/ssi/rep_ca/9/897/ENUS909-049/ENUS909-049.PDF.
By default, the following parallelism and fragmentation features are not enabled:
- parallel query
- parallel index build
- parallel load
- parallel backup
- parallel restore
- parallel sort
- high performance loader
- table fragmentation
- index fragmentation
If you are entitled to use these features, you can enable them. Add the GE_ALLOW_PARALLEL configuration parameter to your onconfig file and set the value for this configuration parameter to 1.
Reference
https://www.ibm.com/support/knowledgecenter/SSGU8G_11.50.0/com.ibm.relnotes.doc/ifx_1150xc7/ids_win_release_notes_11.50.html
댓글 없음:
댓글 쓰기